Bharat Heavy Electrical Ltd. (BHEL) |
MSPGCL |
Replacement/Erection,Overhauling,Testing, Commissioning, Trial Operation and handing over of boiler and its auxiliaries including air Pre Heaters, Ducts and Dampers, Fans Fuel Piping, Boiler Integral Piping, Power Cycle piping,Chemical Dozing system,Lining & isulation,Final Painting fand Transportation of the scrap yard etc. for the work of main plant package of energy efficient renovation & Modernization (EE R &M) unit#6 |
MSPGCL, Koradi TPS, Nagpur Maharashtra |
2016-2019 |
Bharat Heavy Electricals Limited (BHEL) |
NTPC |
UP Gradation, Renovation & Refurbishment work of existing ESPs including Material handling at site stores / storage yard Transportation to site of work ,preassembly of new ducts and dismantling of existing Equipment as required erection,Pre-Commissioning, gas distribution test,trial operation ,testing and commissioning and performance testing of equipment/systejm work on existing electrostatic precipitator and associated ducts including supply and application of final painting for unit #5 & 6 of 2x 110 MW sets |
Talcher Thermal Power station District Angul, orissa |
2013-2018 |
Bharat Heavy Electrical Ltd. (BHEL) |
NTPC |
Collection of materials from BHEL/Client stores/Storage yard, transportation to site of work/Pre-Assembly yard, Erection,Testing assistance for commissioning & trial operation, handing over of esp package including insulation,final painting etc of esp package for unit # 1 at 2X800MW ESP |
LARA, RAIGARH CHHATISGARH |
2014-2019 |
Bharat Heavy Electrical Limited (BHEL- PSSR) |
Monnet Power Co. Ltd.
(MPCL) |
2X525MW, Unit#1&2 Handling of Materials, Erection, Testing, Commissioning of Electro Static Precipitator(E.S.P) |
Malibrahmani TPP, Angul, Orissa |
2011- 2014 |
Bharat Heavy Electricals Limited (BHEL) |
Jhabua Power Limited |
The work of receipt of materials, unloading, verifying, shifting ,stacking, preservation and handing over of components of boiler &auxiliaries, steam turbine & auxiliaries, turbo-generator & auxiliaries, controls and instrumentation of boiler & TG packages, electrical packages, HP & LP piping, refractory & insulation, BHEL’s T&P and components & equipments of various other items and providing services for materials management for unit-1 of 2x600 mw |
Jhabua, Seoni, M.P |
2011-2015 |
Bharat Heavy Electrical Ltd. (BHEL) |
UPRVUNL |
Erection,Testing, Commissioning , PG Test, Post Commissioning Trial Run and handing over Boiler auxiliaries, 110MW, Unit # 7, harduaganj TPS, Aligarh UPRVUNL |
Harduaganj TPS, Aligarh Uttar Pradesh |
2013-2016 |
KBUNL |
NTPC |
Annual Composite Maintenance of Mechanical Maintenance area. (Boiler & Auxiliaries, ESP, Turbine) |
kanti Thermal Power Station |
2014-2015 |
Bharat Heavy Electrical Limited (BHEL- PSNR) |
Punjab State Power Corporation Ltd. (PSPCL) |
Erection, Testing, Commissioning, Trail run and handing over (RandM) of Boiler and Auxiliaries of Unit # 4 of 4x110 MW of GNDTP |
GNDTP Bathinda (Punjab) |
2012-2015 |
Bharat Heavy Electrical Limited (BHEL- PSWR) |
Jaypee Nigrie Super Thermal Power Project |
Providing Services for Material Handling and Management, Transportation at Site of Work, Erection, Testing, Assistance for Commissioning and Trail Operation, Handing Over of Electro Static (ESP) Package including Insulation, Final Painting and Electrical work of unit # 1 and 2 of 2 x 660 MW sets. |
Nigrie, Singrauli (M.P) |
2011-2015 |
Bharat Heavy Electrical Ltd. (BHEL) |
Jindal Thermal Project LTD |
2 x 600 MW, Unit # 1 & 2 Handling of Materials, Erection, Alignment, Welding, Testing, Commissioning, Trial Operation and Handing over of Electrostatic Precipitator (ESP) |
J.P.T.L Angul (Orissa) |
2011-2015 |
Bharat Heavy Electrical Limited (BHEL) |
Dainik Bhaskar Power Limited |
Providing services for Material Handling and Material Management of 2 x 600 MW unit |
DB power Champa (C.G) |
2010-2015 |
Bharat Heavy Electrical Ltd. (BHEL) |
Maruti Suzuki Indian Ltd. |
Erection,Testing, Commissing ,Trial operation & Handing over of all Electrical, C & I. of 1x 17.5MW STG and 2x75 TPH HRSG |
MSIL Gurgaon Haryana |
2010-2013 |
Essar Projects (India) Ltd. |
Essar Power M.P Ltd. |
2X600MW, Unit 1 & 2 ,Thermal Power Plant at Mahan, Handling of Materials, Erection, Alignment, Welding, Testing Commissioning, Trail operation and handling over Boiler along with Auxiliaries. |
Mahan, Madhya Pradesh |
2010 -2013 |
Bharat Heavy Electrical Ltd. (BHEL) |
UPRVUNL |
Various works of De-watering and replacement of rear wall etc of main boiler of 110MW, Unit #5, Harduaganj, TPS, Aligarh |
Harduaganj TPS, Aligarh Uttar Pradesh |
2013-2013 |
Bharat Heavy Electrical Ltd. (BHEL) |
MPPGCL |
Annual Overhauling of Boiler Pressure Part & Boiler Auxiliaries -Fans, Bowl, Mills, RC Feeder, ESP, Ducts/ Dampers of 120MW, Unit #8 MPPGCL, Satpura, Sarni TPS, |
Satpura, TPS Sarni (M.P) |
2013-2013 |
Bharat Heavy Electrical Limited (BHEL) |
National Thermal Power Corporation (NTPC) |
Providing Services for Material Management and Material Handling at 2x500 MW, Unit # 5 and 6 at Rihand Thermal Power Station |
R.T.P.S, Rihand, Sonebhadra (Utter Pradesh) |
2009-2013 |
Bharat Heavy Electrical Limited (BHEL) |
Maruti Suzuki India Limited |
Handling of Material , Erection, Testing, Commissioning, Trail Operation and Handing over of 1 x 75 MW STG and 2 x 75 TPH, HRSG Boiler |
MSIL, Gurgaon (Haryana) |
2010-2012 |
Bharat Heavy Electrical Ltd. (BHEL) |
Utter Pradesh Rajya Vidyut Utpadan Nigam limited (UPRVUNL) |
Erection, Testing, Commissioning and Handing Over of Electro Static Precipitator (ESP) and 2 nos. ID Fans of 1x60 MW at Unit No.5, Harudaganj Thermal Power Station |
H.T.P.S, Aligarh (U.P) |
2010-2012 |
Thermax Engineering Construction Co. Ltd. |
M/s. Bajaj Infrastructure Developmental Company Ltd. |
Handling of Materials, Erection, Alignment, Welding, Testing, Commissioning, Trail operation and Handing over Boiler and its Auxiliaries of unit # 1 and 2 of 2 x 190 TPH CFBC Boliers |
U.T.P.P, Utraula, Balrampur (U.P) |
2010-2012 |
Lanco Infratech Limited |
Lanco Baband Thermal Power Project |
Erection, Testing, Commissioning of Boiler Auxiliaries like Ducting, Rotary parts, Mills, RC Feeders, Electrostatic Precipitator (ESP) with Duct Supports Structure and Coal Piping etc. (Part-B) |
Babandh, Kurunti, Dhenkanal (Orissa) |
2009-2012 |
Larsen and Toubro Ltd. C/o Bharat Heavy Electrical Limited (BHEL) |
Damodar Valley Corporation Ltd. |
2x500 MW, Unit # 1 & 2 Handling of Materials, Erection, Alignment, Welding, Testing, Commissioning, Trail operation and Handing over of Electro Static Precipitator (E.S.P) |
K.T.P.S Koderma (Jharkhand) |
2009-2012 |
Larsen and Toubro Ltd. C/o Bharat Heavy Electrical Limited (BHEL) |
Damodar Valley Corporation Ltd. (DVC) and TATA |
2 x 525 MW, Unit # 2 Handling of Materials, Erection, Alignment, Welding, Testing, Commissioning, Trail operation and Handing over of Electrostatic Precipitator (ESP) |
R.B.T.P.P Maithon Dhanbad (Jharkhand) |
2009-2012 |
Lanco Infratech Limited |
Lanco Anpara Thermal Power Project |
2x600 MW, Unit#2, Anpara-C Thermal Power Project, Handling of Materials, Erection, Alignment, Welding, Testing, Commissioning, Trail operation and Handing over of Boiler along with Auxiliaries |
Anpara, Sonebhadra (U.P) |
2009-2012 |
Larsen and Toubro Ltd. C/o SEPCO, Vedanta |
Vedanta |
4x600 MW, Unit # 3, Handling of Materials, Erection, Alignment, Welding, Testing, Commissioning, Trail operation and Handing over of Steam Turbine Generator (S.T.G) |
Vedanta Jharsuguda (Orrisa) |
2009-2011 |
Bharat Heavy Electrical Limited (BHEL) |
Maruti Suzuki India Ltd. |
1x20 MW Material Handling, Erection, Alignment, Testing, Commissioning, Trail Operation and Handing Over of Gas Turbine Generator Set (G.T.G) including Auxiliaries, Piping, Associated Electrical and C and I Equipment etc. |
M.S.I.L Manesar Gurgaon (Haryana) |
2009-2010 |
Bharat Heavy Electrical Ltd. (BHEL) |
Maruti Suzuki India Ltd. |
1x195 MW, Material Handling, Erection, Alignment, Welding, Testing, Commmissioning, Trial operation and Handing over of Gas Turbine Generator Set (G.T.G) Including Auxiliaries,Piping Associated Electrical and C & I Equipement etc |
MSIL Gurgaon Haryana |
2009-2010 |
Bharat Heavy Electrical Limited (BHEL) |
National Thermal Power Corporation (NTPC) |
1 x 500 MW , unit # 6 Transportation, Pre-Assembly, Erection, Alignment, Welding and Handing over of Boiler & ESP Structures |
FSTPP, Farakka, Murshidabad (West Bengal) |
2008-2009 |
Larsen and Toubro (L&T) C/o Doosan Heavy Industries Ltd. |
National Thermal Power Corporation |
2x660 MW Transportation, Pre-Assembly, Erection, Alignment, Welding, Testing of Pressure Parts and Integral Piping |
Sipat Bilaspur (Chhatisgarh) |
2005-2009 |
Bharat Heavy Electrical Ltd. (B.H.E.L.) |
Indraprastha Power Generation Co. Ltd. |
1x67.5 MW Overhauling of Boiler, Duct, APH and Valves etc. |
Rajghat Delhi |
2006-2007 |
Larsen and Toubro (L&T) |
Hindalco Industries Limited (Aditya Birla Group) |
Fabrication, Erection, Alignment and Welding of Piping |
Renukoot (U.P) |
2004-2005 |
Larsen and Toubro (L&T) |
Rajasthan Rajya Vidyut Utpadan Nigam Limited |
1x 195 MW, Unit # 6 Handing of Materials, Erection, Alignment, Welding, Testing, Commmissioning, Trial operation and Handing over of Boiler, (Part-A) Works Include of Structures, Non- Pressure Parts, Ducts, APH and Piping etc |
Kota (Rajasthan) |
2001-2003 |